Projects
Project
Paris 75014 - Odessa
Creation
- 350,10 m² in floor area
- €804 000 of value created for the condominium association
- €220 000 allocated to the renovations
- €584 000 distributed among all the condominium owners
Renovation
- Creation of a bicycle parking space
- Restoration of common areas
- Restoration of existing façades
- Carriage entrance and portico
- Space for collecting household waste
- Restoration of networks on the façade
- Reconstruction of the cellar units following the restoration
Issy-les-Moulineaux 92130 - Verdun
Creation
- Combination of added building height and densification (addition of four floors to the existing four upper floors to make eight upper floors in total)
- 569,50 m² of floor area
- €421,000of value created for the condominium association allocated to the renovation (100% financing of the works)
Renovation
- Heating (boiler, conduits, and radiators)
- ventilation (room air distribution)
- electricity (general panels, interphone)
- insulation (restoration on the outside, ground-level floor)
- interior finishings (entrance door)
- exterior finishings (glass doors, veranda, blinds)
Project
COMPLETED PROJECTS
Project
Project
Project
Tignes 73320 – Les Roches Rouges
Creation
- 2 stories
- 1400 m² of floor area
- €3, 280,300 in value created for the condominium association
- €2, 725,000 allocated to the renovations
- €555, 300 distributed among all the condominium owners
Renovation
- Thermal insulation applied from the outside
- Restoration of the façades
- Creation of cellar units
- Installation of solar photovoltaic panels
- Thermal renovation of the apartments
- Renovation of common areas
Project
Lyon 69003 - Albert Thomas
Creation
- Combination of added building height and densification
- 863 m²dof floor area
- €576, 850in value created for the condominium association
- €530,250 allocated to the renovations
- €46,600 distributed among all the condominium owners
Renovation
- Thermal insulation applied from the outside
- Replacement of the joinery
- Replacement of the ventilation system
- Creation of an area for bicycles and for trash bins
- Renovation of the common areas
- Replacement of a lift
- Installation of a lift
Tignes 73320 - Santon
Creation
- Added building height (1 story added to the existing two upper floors to make three upper floors in all)
- 374,25 m² of floor areaP
- €1, 029,145 of value created for the condominium association allocated to the renovation works (100% financing of the works)
Renovation
- Restoration and insulation of the façades (renovation of the tone wool, texturing of the ground-level floor, wood and aluminium joinery)
- Thermal renovation of the apartments (heating, water taps, room air distribution, railings, and front doors)
- Renovation of the common areas (lobby door, common areas)
Paris 75015 - Sèvres
Creation
- Additional height (two floors and two crownings added to a building with a ground floor and four upper floors, ultimately creating eight upper floors in total)
- 384,90 m²of floor area
- €1 090 500 of value created for the condominium association allocated to the renovation
(100% financing of the works)
Renovation
- Renovation of the sewage networks
- Renovation of the inner courtyard
- Renovation of the landings and stairs
- Renovation of the roof
- Renovation of the façade
- Insulation of the floor and the attic
- Renovation of the existing joinery
- New locks
- Interior linings
- Heating and ventilation
- Electricity and plumbing
COMPLETED PROJECTS
Sablière – Paris, 14th arrondissement
- 3 floors of housing created
- 128 m² of floor area
- Drywall frame, aluminium curtain wall
Energy rating: “BBC” low energy consumption
Addition of vertical space to a building, creation of two housing units.
Cost: 600,000 euros , pre-tax
Project schedule: 2005-2015
Project manager: ZoomFactor Architects – UpFactor Architecture
COMPLETED PROJECTS
Boulogne 92100 - Tilleuls
- 1 floor of housing
- 265 m² + 117 m² created created
- Wood frame, metal frame, zinc cladding and roof
Energy rating: RT 2012
Addition of building height to an existing structure, creation of four housing units
Cost: 668,000 euros, pre-tax
Project schedule: delivered in 2021
Project manager: ZoomFactor Architects — UpFactor Architecture
COMPLETED PROJECTS
Bourdon_Paris, 4th arrondissement
- 3 floors
- 410 m² of floor area
- CLT timber, Metal frame, “Eternit” cladding
Energy rating: RT 2012
Addition of building height to an existing structure, creation of five housing units
Additional surface area of 410 m²
Cost: Not disclosed
Schedule: in progress
Project manager: Franklin Azzi Architecture
MOEX and OPC ZoomFactor Architects – UpFactor Architecture
Malakoff 92240
- 2 floors
- 143 m² of floor area
- CLT timber, metal frame, zinc cladding and roof
Energy rating: RT 2012
Addition of building height to an existing residential building, creation of two duplex housing units
Cost: Not disclosed
Project schedule: delivered in 2020
Project manager: ZoomFactor Architects – UpFactor Architecture
COMPLETED PROJECTS
Pré Saint Gervais
- 1 floor
- 614 m² of floor area
- Metal frame, Steel sheet cladding and roof
Rehabilitation and extension of offices in a medical centre
Cost 545,042 euros, pre-tax
Project schedule: delivered in 2014
Project manager: ZoomFactor Architects – UpFactor Architecture
COMPLETED PROJECTS
Tocqueville_Paris, 17th arrondissement
- 1 floor
- 25.7 + 20 m² of floor area + 151 m² of balcony space
- Wood and metal frame
Energy rating: RT 2012
Building height added to an apartment, which was also extended
Cost: Not disclosed
Project schedule: delivered in 2020
Project manager: ZoomFactor Architects – UpFactor Architecture
Creation
Grenelle_Paris 15th arrondissement
Creation
Auguste-Blanche_Puteaux
- 3 floors
- 225 m² SDP
- Programme: Addition of building height to a residential building
Energy rating: RT 2012
Cost: Not disclosed
Project schedule: in progress
Project manager: ZoomFactor Architectes & UpFactor Architecture
Creation
Batigere - 92170 Vanves
- 12 housing units created by adding building height
- 957m² of new floor area
Creation
BATIGERE - 92170 Vanves
- + 25 housing units created by adding building height/li>
- 1,830 m² of floor area
Creation
BATIGERE - 92110 Clichy
– + 24 logements en surélévation
– 1584m² de SDP